HOME

WELCOME
Getting Started with the WA
MOBILE HOME (MHEA)
WORK ORDERS
ADVANCED FEATURES
 

Finished Attics

While the example site-built home does not have a finished attic, this lesson reviews the steps needed to enter audit information for a finished attic. Like the entry for an unfinished attic, you will need to have the following information about your structure:

  • Attic area type
  • Attic floor type
  • Area (in square feet)
  • Existing insulation type and depth
  • Type, R-value and/or depth of any added insulation

In this lesson, you will also learn about various attic area types, including:

  • Kneewall
  • Outer ceiling joist
  • Collar beam
  • Roof rafter

This lesson also discusses the options you have for using the Finished Attic tab versus using the Unfinished Attic tab combined with the Walls tab.


ORNL Wx  |  Sitemap  |  System Check  |  Feedback  |  FAQ
© Oak Ridge National Laboratory, All Rights Reserved. new aws prod 7.3.33.